SYNTHETIC DATA · DAr-004 · 2024 FAIL · REPAIR · PASS · no regulatory validity
DEMOEntirely fictional organization, people, partners, addresses and activity.

PORTFOLIO CONTROL

Exceptions first. Evidence always available.

A read-only demonstration of the visibility, ownership and follow-through Norméo brings to 15 properties.

See the situation
Horizon Property Management — DemoSynthetic portfolio · Read only
DEMO

ONE PORTFOLIO. MULTIPLE COMPLIANCE SYSTEMS.

Your providers may differ. Your records should not.

This demo connects due dates, exceptions, evidence and ownership from several specialists in one management view.

AVAILABLE SERVICE: BACKFLOWFILE PREPARATION: LAW 16PRODUCT PREVIEW: POOL/SPA, FIRE AND OTHERS

ATTENTION REQUIRED

Every exception has an owner and a next action.

3 / 12 shown
Bellerive122, chemin de l’Échéance · BouchervilleBackflow
ISSUEPrior report missing7 days open
CURRENT OWNERNorméoProvider : Prior provider — Demo
Request report from prior provider
TARGET2026-08-24Evidence needed
Édifice Molière245, rue des Archives · MontréalBackflow
ISSUEVerification due in 18 days1 days open
CURRENT OWNERAtlas Verification — DemoProvider : Atlas Verification — Demo
Confirm proposed visit
TARGET2026-08-25Evidence available
Bellerive122, chemin de l’Échéance · BouchervilleLaw 16 / Co-ownership · FILE PREP
ISSUEHistorical file incomplete — demo0 days open
CURRENT OWNERProperty manager — DemoProvider : —
Gather historical records
TARGET2026-09-30Evidence needed

TREND

12-month compliance

Corrections and retesting move the portfolio forward.

DOCUMENT COMPLETENESS

46 / 49 required records available

94%

Norméo distinguishes a complete record from one that merely contains files.

NORMÉO HANDLED THIS MONTH

18reminders created12emails sent7SMS sent9reports filed4next dates created2overdue escalations
Entirely synthetic metrics illustrating the represented capabilities.

PROPERTIES

Find the exception, then open the record.

PropertyBackflow statusDevicesNext dueRecord
Bellerive122, chemin de l’Échéance · BouchervilleDue soon42026-09-17100%3 / 3 records
Édifice Molière245, rue des Archives · MontréalDue soon62026-09-06100%3 / 3 records

SYSTEM MATRIX

Where attention is concentrated, across every system.

Backflow states represent the current service. Every other state is synthetic product-preview data.

Sorted by priority
PropertyDAr LIVELaw 16 FILE PREPFire PREVIEWPool PREVIEWElevator PREVIEWDocuments
BelleriveBouchervilleDue soonMissing informationFILE PREP100%
Édifice MolièreMontréalDue soon100%

LAW 16 / CO-OWNERSHIP

Prepare the file, coordinate the professional, track what comes next.

Norméo prepares and coordinates the file; the authorized professional remains responsible for reserved work and deliverables.

LAW 16 PREPARATION
4demo properties1incomplete file3professionals assigned — demo1cycle complete
PropertyMaintenance logFund studyFile readinessProfessionalTargetNext action
BelleriveMissing informationPreparingNot started68%3 item(s) to obtainAug 15, 2028Gather historical recordsCurrent owner : Property manager — Demo
Complexe AtriumVisit scheduledFile readyFile ready100%Heritage Advisory Studio — DemoAuthorized professional — DemoOct 12, 2026Complete the scheduled visitCurrent owner : Heritage Advisory Studio — Demo
Complexe du CanalDocuments receivedReceivedReceived100%Heritage Advisory Studio — DemoResponsible professional — DemoJun 18, 2031Track confirmed actions and review horizonCurrent owner : Norméo — Démo
Immeuble MontcalmProfessional reviewUnder reviewUnder review92%1 item(s) to obtainHeritage Advisory Studio — DemoAuthorized professional — DemoSep 18, 2026Provide the requested facade reportCurrent owner : Property manager — Demo

Important: The percentage measures document-file preparation only. It is not a compliance score or professional opinion.

AFTER THE PROFESSIONAL DELIVERABLES

The PDF remains authoritative. Confirmed recommendations become traceable work.

  1. Professional document received
  2. Recommendation reviewed by a person
  3. Action, owner and due date confirmed
  4. Completion evidence retained

CROSS-SYSTEM SCHEDULE

One consolidated workload, regardless of specialist.

DateSystem / workPropertyConfirmationOwner
2026-09-0630 daysBackflowAnnual verificationÉdifice MolièreProposedVérification Atlas — Démo
2026-09-1730 daysBackflowAnnual verificationBelleriveAccess to confirmVérification Atlas — Démo
PRODUCT DIRECTIONBackflow is the only operational service shown. Other systems illustrate product direction; they are not currently offered.

ONE PLATFORM, MULTIPLE SYSTEMS

One compliance record for the building.

The target model preserves one portfolio, one login, one calendar, one exception list and one reporting layer.

Immeuble Montcalm · synthetic
Backflow preventersCurrent service
Action required
Pool and spaModule not offered
PRODUCT PREVIEW
Fire protectionModule not offered
PRODUCT PREVIEW
Emergency lightingModule not offered
PRODUCT PREVIEW
Document recordCurrent record
94% complete

CROSS-SYSTEM CALENDAR

One consolidated workload.

BackflowÉdifice Molière · Visit proposed
Atlas Verification — Demo
Pool / spaComplexe du Canal · Sample planned — preview
North Shore Laboratory — DemoPREVIEW
Fire protectionComplexe Atrium · Preview only
Provider to be definedPREVIEW
Emergency lightingTour Horizon · Preview only
Provider to be definedPREVIEW

ANNUAL COMPLIANCE BUDGET

Portfolio predictability.

PRODUCT PREVIEW
Completed services
12640 $
Scheduled services
5190 $
Annual forecast
22100 $
Entirely synthetic values. No production financial capability is being advertised.

PROVIDERS AND SERVICE LEVELS

Accountability beyond the appointment.

PRODUCT PREVIEW
SystemProviderResponseScheduledReportSLA
BackflowAtlas Verification — Demo4 h2026-09-06PendingOn target
Pool / spaNorth Shore Laboratory — Demo2026-09-04PreviewNot measured
Fire protectionNordic Fire Systems — Demo2026-08-27PreviewNot measured

COMPLIANCE WORKFLOW PREVIEWS

Different specialists. One management discipline.

PRODUCT PREVIEW

POOL / SPA

Complexe du Canal

PRODUCT PREVIEW
4properties with basins2tests due1sample pending1action required
Field measurementRecord entryLaboratory sampleReport filedException detectedCorrective actionRetestReturn to compliant

Measurement → record → laboratory → exception → correction → retest.

Preview grounded in Regulation Q-2, r. 39 and MELCCFP resources; applicability and parameters must be validated for each facility.

FIRE PROTECTION

Tour Horizon

PRODUCT PREVIEW
Fire alarmCompliant
Emergency lighting12 assetsDue soon
Extinguishers38 assetsCompliant
SprinklersAction required

The specialist performs the work. Norméo brings due dates, ownership, deficiencies and evidence together.

Open the fire record →

ACTIVITY AND AUTOMATIONS

The record keeps working.

Annual reminder sentÉdifice Molière
SMS reminder sentBellerive
Verifier assignedComplexe du Canal
Report publishedTour Horizon
Next annual date createdCampus du Nord
Repair coordination requestedImmeuble Montcalm
Retest completedPlace Laurier

TEAM ACCESS

One portfolio, several responsibilities.

M
Marie TremblayPortfolio administrator · All properties
J
Julien RoyProperty manager · 8 properties
S
Sarah NguyenViewer · Reports and evidence

MANAGEMENT REPORTING

Clear evidence for management, the board or an insurer.

The executive report places cross-system exceptions, providers, upcoming workload and document completeness before the detailed registers.

Read only

Editing controls are disabled. No demo data or actions are saved.

FOR 20, 50 OR 100+ PROPERTIES

See how Norméo would organize your portfolio.

Show us your current due dates and reports. We’ll show you where control can be restored.